Watts CO26 User Manual

Browse online or download User Manual for Water equipment Watts CO26. Watts CO26 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 1
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Tag:
WATTS Drainage reserves the right to modify or change product design or construction without prior notice and without incurring any obligation to make similar changes and modifications to
products previously or subsequently sold. See your WATTS Drainage representative for any clarification. Dimensions are subject to manufacturing tolerances.
USA: 100 Watts Road, Spindale, NC, 28160 TEL: 828-288-2179 TOLL-FREE: 1-800-338-2581 Website: www.wattsdrainage.com
ES-WDPL-CO26 USA 0444 CO26
® Watts Drainage 2004
Job Name
––––––––––––––––––––––––––––––––––––––––––––––––––––––
Job Location
––––––––––––––––––––––––––––––––––––––––––––––––––––
Engineer
––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Contractor
–––––––––––––––––––––––––––––––––––––––––––––––––––––––
Contractor’s P.O. No.
––––––––––––––––––––––––––––––––––––––––––––
Representative
–––––––––––––––––––––––––––––––––––––––––––––––––––
SPECIFICATION: Watts ProLine CO26 PVC, ABS, or cast iron floor cleanout with ductile iron or nickel bronze non-skid
top, and removable gasketed brass cleanout plug.
CO26
8" Dia. Adjustable
Floor Cleanout
PROLINE
Pipe Sizing (Select One)
Suffix Description
-3PVC 3" PVC
-3ABS 3" ABS
-3NH 3" No Hub
-3PT 3" Push-On
-4PVC 4" PVC
-4ABS 4" ABS
-4NH 4" No Hub
-4PT 4" Push-On
-6NH 6" No Hub
-6PT 6" Push-On
-8NH 8" No Hub
-8PT 8" Push-On
Options (Select One or More)
Suffix Description
-NB Nickel Bronze Top
-VP Vandal Proof Screws
10-3/16" (259)
8-5/16" (211)
3"
(76)
2-1/2" (63) MIN.
3-1/4" (83) MAX.
PIPE SIZE
Page view 0
1

Summary of Contents

Page 1 - Floor Cleanout

Tag:WATTS Drainage reserves the right to modify or change product design or construction without prior notice and without incurring any obligation to

Comments to this Manuals

No comments